At the company I work for we have loads of sheet metal delivered on big pallets. The pallets are stacked and stored until such time as they are taken away to be chipped (at our cost).
I negioated with our production manager, and our driver and had them all delivered to my plot on Saturday. The driver and I spent the next hour and half breaking them up into their constiuent planks.
I now have two large piles of wood planks/posts ready to make rasied beds.
I reckon there's enough there to build a half decent shed!
All excited - sad isn't it?
Comment