I am unable to contact the guy who did the work unfortunately.
I will try to explain the situation better.
Before the structure was installed there was just a huge unsightly slab of concrete with a flower bed and some steps leading from the concrete down to the garden. They build a frame for the decking and laid that first. then they laid built the 'wall' and backfilled the area with hardcore and topped with sand then laid the slabs.
sorry to confuse, i think the water was just some dish water my wife threw out of the back door :-)