What is the correct mix to render concrete walls that are below ground level, where one side has been excavated and the other side is earth. Concrete is about 4' high. Rough, uneven surface that I want to make flat to take brackets and fixings.
Cold damp will probably be a factor in winter. Humidity in summer. No winter heating source.
Do I need rendering sand (what grade is that)? Or concrete? Roughly what consistancy? Applying it won't be a problem; I've plastered walls before. It's the technical aspect of the mix that I'm unsure about.
Cold damp will probably be a factor in winter. Humidity in summer. No winter heating source.
Do I need rendering sand (what grade is that)? Or concrete? Roughly what consistancy? Applying it won't be a problem; I've plastered walls before. It's the technical aspect of the mix that I'm unsure about.