Feeling quite proud of this - several months in the planning and execution and the customary 5 pints of sweat
Method of construction
Still to do:
Learning points
Method of construction
- Clear site, dig over and then level off
- Submerge formers to sit vertical poles in (50cm sections of 110mm soil pipe)
- Locate (50mm) poles, set in postmix concrete
- Construct remaining structure (25mm x 50mm batten, 47mm x 50mm regularised timber)
Still to do:
- Put in wires
- er, put some raspberry plants in (plus a couple of grape vines and perhaps a rose)
- Sit back and admire.
Learning points
- Use deeper formers
- Use wider upright posts
Comment